Soft Skills Engineering

Episode 394: Scrum master, weapons master and minimum tenure to not look bad

Informações:

Synopsis

In this episode, Dave and Jamison answer these questions: My team are about 4 months into transitioning from a scrum/kanban way of working to a more traditional scrum/sprint way of working. I feel like our scrum master is “weaponising” some of the scrum practices in order to show up weak points and failures in the team, rather than working with the team to ease us through the transition and make gradual improvements. In private conversations with me and some other trusted developers (lol jk I clearly shouldn’t be trusted as I’m writing in to Dave and Jamison) the scrum master speaks about how little refined work we have in our back log, and how they are looking forward to “exposing bottle necks” in the team. As they expect this will lead to pressure on our PO and Business Analyst and force them to step up their game. Whatever amount of work we bring into a sprint is law, and they forbid more tickets coming onto the board mid sprint (even if all the tickets are done half way through the